Remediation & enabling works: HS2, Birmingham
McAuliffe was contracted to carry out extensive remediation, enabling works and archaeological support on this high-profile site, which sits at the heart of the High Speed 2 line.
McAuliffe owns one of the UK’s largest in-house fleets of intelligent plant, which combines GPS satellite technology with sensor-enabled construction equipment.
Drawing on over a decade’s experience, McAuliffe operators deliver your 3D digital terrain model straight from cab of the intelligent excavator, dozer or roller.
Intelligent plant makes manual setting out a thing of the past, with highly accurate data – including cut and fill levels, turnover depths and sampling locations – recorded in real-time by our operators for verification. Positions of live services and hazardous areas are also identified to create safe working zones.
Using 3D SiteLink software, our engineers monitor works remotely, troubleshooting issues before they arise and ensuring efficient delivery that’s right first time.
Intelligent plant is only as good as the people behind it. We directly employ and train our operators to ensure consistently high standards are maintained across every site.